Rustenburg
Boumat: Menlyn
Hawker stalls
Centurion
Turn Key
3000 m2
Dome
Hawker Stalls
Structural steel
Concrete frame with basement
Staircase
Staircase enclosure
During construction
First floor reinforcing
Periculum Property, Rustenburg
Soffit detail
Post tension cable anchors
Reinforcing inspections
Reinforcing for concrete floor
Fixing reinforcing
Construction phase
End product
Tass Rib-and-Block system
Typical raft foundation
Western Elevation
Schoongezicht House
Steel support frame
On the rocks
Delta building
Delta Place
Turnhall
Turnhall Building (Later became Goma Goma)
Standard Factories
Paper products factory
Steel warehouse
New Factory
Rendering Plant
Rendering dams
Turnkey
40 ton EOC Building
New factory
10 Ton EOC Building
Mooinooi
Conveyor
Live Ore Stockpile Conveyor
Conveyor Take-up
Earth dam
Remote vent stations
10 Ton EOC building
Original Structure
Steel frame
Phase II
PH II: Steel frame
Special floor screeds
Spiral freezer
Siral freezer building
Siral freezer Building
Air Chiller building
500kL Reservoir
500kL Reservoir pump station
Bio filter
Main building
Steel frame structure
Stadium
Gym Hall
Officers Mess
Admin Building
Gym Hall completed
Structural steel frame
Steel connections
Cement Store
700 Ton Steel factory
Wave Pool Dome
Wave Pool Dome: During Construction
Steel frame arches
Turn-Key project
6 Mega Liter Reservoir Reinforcing for base
Shutters in place
Concrete upstand beams
Steel reservoir floor
Internal reservoir Bracing
Completed reservoir
Completed Reservoir
Side elevation with water lines installed
Concrete Valve Chamber
Side elevation
Water lines and Valves connected